Growth Metrics

Southern (SOJD) Construction in Progress (2016 - 2025)

Historic Construction in Progress for Southern (SOJD) over the last 17 years, with Q3 2025 value amounting to $9.2 billion.

  • Southern's Construction in Progress rose 4825.1% to $9.2 billion in Q3 2025 from the same period last year, while for Sep 2025 it was $9.2 billion, marking a year-over-year increase of 4825.1%. This contributed to the annual value of $6.4 billion for FY2024, which is 1792.14% down from last year.
  • According to the latest figures from Q3 2025, Southern's Construction in Progress is $9.2 billion, which was up 4825.1% from $7.7 billion recorded in Q2 2025.
  • Southern's Construction in Progress' 5-year high stood at $12.0 billion during Q2 2023, with a 5-year trough of $5.2 billion in Q2 2024.
  • Over the past 5 years, Southern's median Construction in Progress value was $9.2 billion (recorded in 2025), while the average stood at $8.8 billion.
  • In the last 5 years, Southern's Construction in Progress plummeted by 5637.93% in 2024 and then surged by 4825.1% in 2025.
  • Over the past 5 years, Southern's Construction in Progress (Quarter) stood at $8.8 billion in 2021, then rose by 24.23% to $10.9 billion in 2022, then decreased by 28.56% to $7.8 billion in 2023, then decreased by 17.92% to $6.4 billion in 2024, then surged by 44.61% to $9.2 billion in 2025.
  • Its Construction in Progress stands at $9.2 billion for Q3 2025, versus $7.7 billion for Q2 2025 and $7.2 billion for Q1 2025.