South Bow (SOBO) Construction in Progress (2023 - 2025)
South Bow has reported Construction in Progress over the past 3 years, most recently at $24.0 million for Q4 2025.
- Quarterly results put Construction in Progress at $24.0 million for Q4 2025, up 9.09% from a year ago — trailing twelve months through Dec 2025 was $24.0 million (up 9.09% YoY), and the annual figure for FY2025 was $24.0 million, up 9.09%.
- Construction in Progress for Q4 2025 was $24.0 million at South Bow, up from $22.0 million in the prior quarter.
- Over the last five years, Construction in Progress for SOBO hit a ceiling of $24.0 million in Q4 2025 and a floor of $7.0 million in Q4 2023.
- Median Construction in Progress over the past 3 years was $22.0 million (2024), compared with a mean of $17.7 million.
- Biggest five-year swings in Construction in Progress: surged 214.29% in 2024 and later rose 9.09% in 2025.
- South Bow's Construction in Progress stood at $7.0 million in 2023, then surged by 214.29% to $22.0 million in 2024, then grew by 9.09% to $24.0 million in 2025.
- The last three reported values for Construction in Progress were $24.0 million (Q4 2025), $22.0 million (Q4 2024), and $7.0 million (Q4 2023) per Business Quant data.