Sun Pacific Holding Corp. (SNPW) Construction in Progress (2016 - 2019)
Sun Pacific Holding (SNPW) has disclosed Construction in Progress for 3 consecutive years, with $255299.0 as the latest value for Q3 2019.
- For the quarter ending Q3 2019, Construction in Progress changed N/A year-over-year to $255299.0, compared with a TTM value of $255299.0 through Sep 2019, changed N/A, and an annual FY2016 reading of $18150.0, changed 0.0% over the prior year.
- Construction in Progress was $255299.0 for Q3 2019 at Sun Pacific Holding, up from $18150.0 in the prior quarter.
- Across five years, Construction in Progress topped out at $255299.0 in Q3 2019 and bottomed at $18150.0 in Q3 2015.
- Average Construction in Progress over 3 years is $66008.2, with a median of $30650.0 recorded in 2015.
- Peak annual rise in Construction in Progress hit 0.0% in 2016, while the deepest fall reached 0.0% in 2016.
- Year by year, Construction in Progress stood at $43150.0 in 2015, then tumbled by 57.94% to $18150.0 in 2016, then skyrocketed by 1306.61% to $255299.0 in 2019.
- Business Quant data shows Construction in Progress for SNPW at $255299.0 in Q3 2019, $18150.0 in Q3 2016, and $18150.0 in Q2 2016.