SEACOR Marine Holdings (SMHI) Construction in Progress (2016 - 2025)
SEACOR Marine Holdings has reported Construction in Progress over the past 10 years, most recently at $47.0 million for Q4 2025.
- Quarterly results put Construction in Progress at $47.0 million for Q4 2025, up 294.84% from a year ago — trailing twelve months through Dec 2025 was $47.0 million (up 294.84% YoY), and the annual figure for FY2025 was $47.0 million, up 294.84%.
- Construction in Progress for Q4 2025 was $47.0 million at SEACOR Marine Holdings, up from $40.4 million in the prior quarter.
- Over the last five years, Construction in Progress for SMHI hit a ceiling of $47.0 million in Q4 2025 and a floor of $8.1 million in Q4 2022.
- Median Construction in Progress over the past 5 years was $13.4 million (2024), compared with a mean of $19.0 million.
- Biggest five-year swings in Construction in Progress: tumbled 72.53% in 2021 and later surged 294.84% in 2025.
- SEACOR Marine Holdings' Construction in Progress stood at $15.5 million in 2021, then plummeted by 47.78% to $8.1 million in 2022, then increased by 27.75% to $10.4 million in 2023, then grew by 14.88% to $11.9 million in 2024, then surged by 294.84% to $47.0 million in 2025.
- The last three reported values for Construction in Progress were $47.0 million (Q4 2025), $40.4 million (Q3 2025), and $31.8 million (Q2 2025) per Business Quant data.