Cash Flow Statement
Growth Metrics

Stabilis Solutions (SLNG) Construction in Progress (2023 - 2026)

Stabilis Solutions filings provide 3 years of Construction in Progress readings, the most recent being $14.9 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 83.95% to $14.9 million in Q4 2025 year-over-year; TTM through Dec 2025 was $14.9 million, a 83.95% increase, with the full-year FY2025 number at $14.9 million, up 83.95% from a year prior.
  • Construction in Progress hit $14.9 million in Q4 2025 for Stabilis Solutions, up from $8.1 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $14.9 million in Q4 2025 to a low of $8.1 million in Q4 2024.
  • Median Construction in Progress over the past 3 years was $9.9 million (2023), compared with a mean of $11.0 million.
  • Biggest five-year swings in Construction in Progress: dropped 18.18% in 2024 and later skyrocketed 83.95% in 2025.
  • Stabilis Solutions' Construction in Progress stood at $9.9 million in 2023, then fell by 18.18% to $8.1 million in 2024, then skyrocketed by 83.95% to $14.9 million in 2025.
  • The last three reported values for Construction in Progress were $14.9 million (Q4 2025), $8.1 million (Q4 2024), and $9.9 million (Q4 2023) per Business Quant data.