Tanger (SKT) Buildings (2016 - 2026)

Tanger has reported Buildings over the past 18 years, most recently at $3.4 billion for Q1 2026.

  • Quarterly Buildings rose 6.17% to $3.4 billion in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $3.4 billion through Mar 2026, up 6.17% year-over-year, with the annual reading at $3.4 billion for FY2025, 8.77% up from the prior year.
  • Buildings was $3.4 billion for Q1 2026 at Tanger, roughly flat from $3.4 billion in the prior quarter.
  • Over five years, Buildings peaked at $3.4 billion in Q1 2026 and troughed at $2.5 billion in Q1 2022.
  • The 5-year median for Buildings is $2.9 billion (2024), against an average of $2.9 billion.
  • Year-over-year, Buildings increased 0.36% in 2022 and then grew 16.9% in 2024.
  • A 5-year view of Buildings shows it stood at $2.6 billion in 2022, then increased by 15.08% to $2.9 billion in 2023, then increased by 5.13% to $3.1 billion in 2024, then increased by 8.77% to $3.4 billion in 2025, then rose by 0.25% to $3.4 billion in 2026.
  • Per Business Quant, the three most recent readings for SKT's Buildings are $3.4 billion (Q1 2026), $3.4 billion (Q4 2025), and $3.3 billion (Q3 2025).