KPIs & Operating Metrics(New)

Southern First Bancshares (SFST) Construction in Progress (2024 - 2025)

Southern First Bancshares (SFST) has disclosed Construction in Progress for 2 consecutive years, with $219000.0 as the latest value for Q4 2025.

  • Quarterly Construction in Progress rose 291.07% to $219000.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $219000.0 through Dec 2025, up 291.07% year-over-year, with the annual reading at $219000.0 for FY2025, 291.07% up from the prior year.
  • Construction in Progress for Q4 2025 was $219000.0 at Southern First Bancshares, up from $56000.0 in the prior quarter.
  • The five-year high for Construction in Progress was $219000.0 in Q4 2025, with the low at $56000.0 in Q4 2024.