Growth Metrics

Sadot (SDOT) Construction in Progress (2022)

Sadot's Construction in Progress history spans 1 years, with the latest figure at $5000.0 for Q4 2022.

  • For Q4 2022, Construction in Progress changed N/A year-over-year to $5000.0; the TTM value through Dec 2022 reached $5000.0, changed N/A, while the annual FY2022 figure was $5000.0, N/A changed from the prior year.
  • Construction in Progress reached $5000.0 in Q4 2022 per SDOT's latest filing.
  • In the past five years, Construction in Progress ranged from a high of $5000.0 in Q4 2022 to a low of $5000.0 in Q4 2022.