Seabridge Gold (SA) Construction in Progress (2021 - 2025)

Seabridge Gold's Construction in Progress history spans 5 years, with the latest figure at $27.2 million for Q4 2025.

  • Quarterly Construction in Progress fell 14.46% to $27.2 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $27.2 million through Dec 2025, down 14.46% year-over-year, with the annual reading at $27.2 million for FY2025, 14.46% down from the prior year.
  • Construction in Progress came in at $27.2 million for Q4 2025, down from $31.9 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $115.2 million in Q4 2023 to a low of $21.5 million in Q4 2021.
  • The 5-year median for Construction in Progress is $31.9 million (2024), against an average of $54.6 million.
  • Year-over-year, Construction in Progress surged 258.94% in 2022 and then plummeted 72.36% in 2024.
  • Seabridge Gold's Construction in Progress stood at $21.5 million in 2021, then soared by 258.94% to $77.1 million in 2022, then soared by 49.56% to $115.2 million in 2023, then plummeted by 72.36% to $31.9 million in 2024, then dropped by 14.46% to $27.2 million in 2025.
  • Per Business Quant, the three most recent readings for SA's Construction in Progress are $27.2 million (Q4 2025), $31.9 million (Q4 2024), and $115.2 million (Q4 2023).