Growth Metrics

George Risk Industries (RSKIA) Construction in Progress (2020 - 2026)

George Risk Industries has reported Construction in Progress over the past 7 years, most recently at $10000.0 for Q1 2026.

  • Quarterly results put Construction in Progress at $10000.0 for Q1 2026, changed 0.0% from a year ago — trailing twelve months through Jan 2026 was $10000.0 (changed 0.0% YoY), and the annual figure for FY2025 was $10000.0, down 23.08%.
  • Construction in Progress for Q1 2026 was $10000.0 at George Risk Industries, roughly flat from $10000.0 in the prior quarter.
  • Over the last five years, Construction in Progress for RSKIA hit a ceiling of $259000.0 in Q1 2022 and a floor of $10000.0 in Q4 2024.
  • Median Construction in Progress over the past 5 years was $13000.0 (2023), compared with a mean of $48823.5.
  • Biggest five-year swings in Construction in Progress: soared 407.84% in 2022 and later plummeted 85.71% in 2024.
  • George Risk Industries' Construction in Progress stood at $90000.0 in 2022, then plummeted by 85.56% to $13000.0 in 2023, then fell by 23.08% to $10000.0 in 2024, then changed by 0.0% to $10000.0 in 2025, then changed by 0.0% to $10000.0 in 2026.
  • The last three reported values for Construction in Progress were $10000.0 (Q1 2026), $10000.0 (Q4 2025), and $10000.0 (Q3 2025) per Business Quant data.