Rapid7 (RPD) Construction in Progress: 2018-2019
Historic Construction in Progress for Rapid7 (RPD) over the last 1 years, with Dec 2019 value amounting to $30.2 million.
- Rapid7's Construction in Progress rose 655.00% to $30.2 million in Q4 2019 from the same period last year, while for Dec 2019 it was $30.2 million, marking a year-over-year increase of 655.00%. This contributed to the annual value of $30.2 million for FY2019, which is 655.00% up from last year.
- Rapid7's Construction in Progress amounted to $30.2 million in Q4 2019, which was up 2.72% from $29.4 million recorded in Q3 2019.
- In the past 5 years, Rapid7's Construction in Progress registered a high of $30.5 million during Q2 2019, and its lowest value of $4.0 million during Q4 2018.
- For the 2-year period, Rapid7's Construction in Progress averaged around $22.6 million, with its median value being $29.4 million (2019).
- Data for Rapid7's Construction in Progress shows a peak YoY skyrocketed of 655.00% (in 2019) over the last 5 years.
- Over the past 2 years, Rapid7's Construction in Progress (Quarterly) stood at $4.0 million in 2018, then soared by 655.00% to $30.2 million in 2019.
- Its last three reported values are $30.2 million in Q4 2019, $29.4 million for Q3 2019, and $30.5 million during Q2 2019.