Growth Metrics

Rubber Leaf (RLEA) Construction in Progress (2021 - 2023)

Rubber Leaf posted quarterly Construction in Progress of $4.8 million for Q3 2023, up 1449.3% year-on-year from $307889.0 in Q3 2022, and up 10.68% on a QoQ basis from $4.3 million in Q2 2023.

Rubber Leaf (RLEA) has 3 years of Construction in Progress data on file, last reported at $4.8 million in Q3 2023.

  • For the quarter ending Q3 2023, Construction in Progress rose 1449.3% year-over-year to $4.8 million; the trailing twelve-month figure through Sep 2023 stood at $4.8 million (up 1449.3% YoY), and the FY2022 full-year result was $2.5 million, up 796.66% from the prior year.
  • Construction in Progress for Q3 2023 stood at $4.8 million, up from $4.3 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $4.8 million in Q3 2023 and bottomed at $280914.0 in Q4 2021.
  • The 3-year median for Construction in Progress is $3.0 million (2022), against an average of $2.6 million.
  • The widest annual swing landed in 2022, when Construction in Progress jumped 796.66%; it then jumped 1449.3% in 2023.
  • A 3-year view of Construction in Progress shows it stood at $280914.0 in 2021, then surged by 796.66% to $2.5 million in 2022, then jumped by 89.38% to $4.8 million in 2023.
  • The last three Construction in Progress figures came in at $4.8 million (Q3 2023), $4.3 million (Q2 2023), and $3.6 million (Q1 2023), per Business Quant data.

Historic Data

Download Data 🔒
DateValue
Sep 30, 2023 4.77 Mn
Jun 30, 2023 4.31 Mn
Mar 31, 2023 3.57 Mn
Dec 31, 2022 2.52 Mn
Sep 30, 2022 307,889.00
Dec 31, 2021 280,914.00