Rubber Leaf (RLEA) Construction in Progress (2021 - 2023)
Historic Construction in Progress for Rubber Leaf (RLEA) over the last 3 years, with Q3 2023 value amounting to $4.8 million.
- Rubber Leaf's Construction in Progress rose 144929.6% to $4.8 million in Q3 2023 from the same period last year, while for Sep 2023 it was $4.8 million, marking a year-over-year increase of 144929.6%. This contributed to the annual value of $2.5 million for FY2022, which is 79665.73% up from last year.
- As of Q3 2023, Rubber Leaf's Construction in Progress stood at $4.8 million, which was up 144929.6% from $4.3 million recorded in Q2 2023.
- Over the past 5 years, Rubber Leaf's Construction in Progress peaked at $4.8 million during Q3 2023, and registered a low of $280914.0 during Q4 2021.
- Its 3-year average for Construction in Progress is $2.6 million, with a median of $3.0 million in 2022.
- Per our database at Business Quant, Rubber Leaf's Construction in Progress soared by 79665.73% in 2022 and then skyrocketed by 144929.6% in 2023.
- Over the past 3 years, Rubber Leaf's Construction in Progress (Quarter) stood at $280914.0 in 2021, then surged by 796.66% to $2.5 million in 2022, then surged by 89.38% to $4.8 million in 2023.
- Its last three reported values are $4.8 million in Q3 2023, $4.3 million for Q2 2023, and $3.6 million during Q1 2023.