Growth Metrics

Rh (RH) Construction in Progress (2019 - 2025)

Historic Construction in Progress for Rh (RH) over the last 7 years, with Q4 2025 value amounting to $113.4 million.

  • Rh's Construction in Progress fell 3320.16% to $113.4 million in Q4 2025 from the same period last year, while for Nov 2025 it was $113.4 million, marking a year-over-year decrease of 3320.16%. This contributed to the annual value of $138.7 million for FY2025, which is 1665.64% up from last year.
  • Latest data reveals that Rh reported Construction in Progress of $113.4 million as of Q4 2025, which was down 3320.16% from $166.3 million recorded in Q3 2025.
  • Rh's 5-year Construction in Progress high stood at $209.1 million for Q4 2021, and its period low was $29.4 million during Q3 2022.
  • Moreover, its 5-year median value for Construction in Progress was $137.1 million (2021), whereas its average is $128.5 million.
  • As far as peak fluctuations go, Rh's Construction in Progress crashed by 8542.27% in 2022, and later surged by 16213.93% in 2023.
  • Over the past 5 years, Rh's Construction in Progress (Quarter) stood at $209.1 million in 2021, then crashed by 81.88% to $37.9 million in 2022, then soared by 146.85% to $93.5 million in 2023, then skyrocketed by 81.53% to $169.8 million in 2024, then tumbled by 33.2% to $113.4 million in 2025.
  • Its last three reported values are $113.4 million in Q4 2025, $166.3 million for Q3 2025, and $168.1 million during Q2 2025.