Growth Metrics

Rh (RH) Construction in Progress (2019 - 2026)

Rh has reported Construction in Progress over the past 8 years, most recently at $156.3 million for Q1 2026.

  • For Q1 2026, Construction in Progress rose 12.65% year-over-year to $156.3 million; the TTM value through Jan 2026 reached $156.3 million, up 12.65%, while the annual FY2026 figure was $156.3 million, 12.65% up from the prior year.
  • Construction in Progress for Q1 2026 was $156.3 million at Rh, up from $113.4 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $204.0 million in Q1 2022 and troughed at $29.4 million in Q3 2022.
  • A 5-year average of $118.3 million and a median of $118.9 million in 2024 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: tumbled 85.42% in 2022 and later skyrocketed 162.14% in 2023.
  • Year by year, Construction in Progress stood at $37.9 million in 2022, then surged by 146.85% to $93.5 million in 2023, then skyrocketed by 81.53% to $169.8 million in 2024, then crashed by 33.2% to $113.4 million in 2025, then soared by 37.76% to $156.3 million in 2026.
  • Business Quant data shows Construction in Progress for RH at $156.3 million in Q1 2026, $113.4 million in Q4 2025, and $166.3 million in Q3 2025.