Richardson Electronics (RELL) Construction in Progress (2018 - 2025)
Richardson Electronics filings provide 11 years of Construction in Progress readings, the most recent being $2.8 million for Q2 2025.
- On a quarterly basis, Construction in Progress rose 26.31% to $2.8 million in Q2 2025 year-over-year; TTM through May 2025 was $2.8 million, a 26.31% increase, with the full-year FY2025 number at $2.8 million, up 26.31% from a year prior.
- Construction in Progress hit $2.8 million in Q2 2025 for Richardson Electronics, up from $2.2 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $4.4 million in Q2 2023 to a low of $1.4 million in Q2 2021.
- Median Construction in Progress over the past 5 years was $2.2 million (2024), compared with a mean of $2.6 million.
- Biggest five-year swings in Construction in Progress: soared 122.85% in 2023 and later tumbled 50.06% in 2024.
- Richardson Electronics' Construction in Progress stood at $1.4 million in 2021, then skyrocketed by 39.33% to $2.0 million in 2022, then skyrocketed by 122.85% to $4.4 million in 2023, then tumbled by 50.06% to $2.2 million in 2024, then grew by 26.31% to $2.8 million in 2025.
- The last three reported values for Construction in Progress were $2.8 million (Q2 2025), $2.2 million (Q2 2024), and $4.4 million (Q2 2023) per Business Quant data.