Rectitude Holdings (RECT) Construction in Progress (2025)

Rectitude Holdings filings provide 1 years of Construction in Progress readings, the most recent being $321365.1 for Q1 2025.

  • On a quarterly basis, Construction in Progress changed N/A to $321365.1 in Q1 2025 year-over-year; TTM through Mar 2025 was $321365.1, a N/A change, with the full-year FY2025 number at $322009.0, changed N/A from a year prior.
  • Construction in Progress hit $321365.1 in Q1 2025 for Rectitude Holdings.
  • In the past five years, Construction in Progress ranged from a high of $321365.1 in Q1 2025 to a low of $321365.1 in Q1 2025.