KPIs & Operating Metrics(New)
Growth Metrics

Patterson Uti Energy (PTEN) Restructuring Costs (2017 - 2025)

Historic Restructuring Costs for Patterson Uti Energy (PTEN) over the last 7 years, with Q4 2025 value amounting to $6000.0.

  • Patterson Uti Energy's Restructuring Costs fell 9982.66% to $6000.0 in Q4 2025 from the same period last year, while for Dec 2025 it was $1.0 million, marking a year-over-year decrease of 9692.47%. This contributed to the annual value of $1.0 million for FY2025, which is 9692.47% down from last year.
  • Latest data reveals that Patterson Uti Energy reported Restructuring Costs of $6000.0 as of Q4 2025, which was down 9982.66% from $90000.0 recorded in Q3 2025.
  • In the past 5 years, Patterson Uti Energy's Restructuring Costs ranged from a high of $70.2 million in Q3 2023 and a low of $6000.0 during Q4 2025
  • For the 5-year period, Patterson Uti Energy's Restructuring Costs averaged around $8.6 million, with its median value being $1.9 million (2022).
  • Its Restructuring Costs has fluctuated over the past 5 years, first surged by 29235000.0% in 2023, then tumbled by 9982.66% in 2025.
  • Quarter analysis of 5 years shows Patterson Uti Energy's Restructuring Costs stood at $10.0 million in 2021, then crashed by 99.76% to $24000.0 in 2022, then soared by 83020.83% to $19.9 million in 2023, then tumbled by 82.66% to $3.5 million in 2024, then crashed by 99.83% to $6000.0 in 2025.
  • Its Restructuring Costs stands at $6000.0 for Q4 2025, versus $90000.0 for Q3 2025 and $488000.0 for Q2 2025.