Proto Labs (PRLB) Construction in Progress (2016 - 2022)
Proto Labs (PRLB) has disclosed Construction in Progress for 12 consecutive years, with $22.7 million as the latest value for Q4 2022.
- Quarterly Construction in Progress rose 56.49% to $22.7 million in Q4 2022 from the year-ago period, while the trailing twelve-month figure was $22.7 million through Dec 2022, up 56.49% year-over-year, with the annual reading at $22.7 million for FY2022, 56.49% up from the prior year.
- Construction in Progress hit $22.7 million in Q4 2022 for Proto Labs, up from $14.5 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $54.3 million in Q4 2019 to a low of $14.5 million in Q4 2021.
- Historically, Construction in Progress has averaged $30.1 million across 5 years, with a median of $25.3 million in 2018.
- Biggest five-year swings in Construction in Progress: surged 181.25% in 2018 and later crashed 57.11% in 2021.
- Year by year, Construction in Progress stood at $25.3 million in 2018, then soared by 114.85% to $54.3 million in 2019, then crashed by 37.8% to $33.8 million in 2020, then plummeted by 57.11% to $14.5 million in 2021, then soared by 56.49% to $22.7 million in 2022.
- Business Quant data shows Construction in Progress for PRLB at $22.7 million in Q4 2022, $14.5 million in Q4 2021, and $33.8 million in Q4 2020.