Growth Metrics

Pool (POOL) Construction in Progress (2016 - 2025)

Pool's Construction in Progress history spans 16 years, with the latest figure at $6.5 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 56.83% year-over-year to $6.5 million; the TTM value through Dec 2025 reached $6.5 million, down 56.83%, while the annual FY2025 figure was $6.5 million, 56.83% down from the prior year.
  • Construction in Progress reached $6.5 million in Q4 2025 per POOL's latest filing, down from $15.0 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $15.0 million in Q4 2024 to a low of $6.2 million in Q4 2021.
  • Average Construction in Progress over 5 years is $10.6 million, with a median of $10.9 million recorded in 2022.
  • Peak YoY movement for Construction in Progress: surged 75.99% in 2022, then tumbled 56.83% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $6.2 million in 2021, then skyrocketed by 75.99% to $10.9 million in 2022, then skyrocketed by 34.81% to $14.7 million in 2023, then rose by 2.45% to $15.0 million in 2024, then crashed by 56.83% to $6.5 million in 2025.
  • Per Business Quant, the three most recent readings for POOL's Construction in Progress are $6.5 million (Q4 2025), $15.0 million (Q4 2024), and $14.7 million (Q4 2023).