Pony AI (PONY) Construction in Progress (2022 - 2025)

Pony AI's Construction in Progress history spans 4 years, with the latest figure at $22.8 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 3726.8% to $22.8 million in Q4 2025 year-over-year; TTM through Dec 2025 was $22.8 million, a 3726.8% increase, with the full-year FY2025 number at $22.8 million, up 3726.8% from a year prior.
  • Construction in Progress hit $22.8 million in Q4 2025 for Pony AI, up from $597000.0 in the prior quarter.
  • Over the last five years, Construction in Progress for PONY hit a ceiling of $22.8 million in Q4 2025 and a floor of $7000.0 in Q4 2023.
  • Historically, Construction in Progress has averaged $5.9 million across 4 years, with a median of $361000.0 in 2022.
  • Biggest five-year swings in Construction in Progress: crashed 94.4% in 2023 and later surged 8428.57% in 2024.
  • Tracing PONY's Construction in Progress over 4 years: stood at $125000.0 in 2022, then crashed by 94.4% to $7000.0 in 2023, then surged by 8428.57% to $597000.0 in 2024, then soared by 3726.8% to $22.8 million in 2025.
  • Business Quant data shows Construction in Progress for PONY at $22.8 million in Q4 2025, $597000.0 in Q4 2024, and $7000.0 in Q4 2023.