Pony AI (PONY) Construction in Progress (2022 - 2024)
Pony AI (PONY) has disclosed Construction in Progress for 3 consecutive years, with $597000.0 as the latest value for Q4 2024.
- Quarterly Construction in Progress rose 8428.57% to $597000.0 in Q4 2024 from the year-ago period, while the trailing twelve-month figure was $597000.0 through Dec 2024, up 8428.57% year-over-year, with the annual reading at $597000.0 for FY2024, 8428.57% up from the prior year.
- Construction in Progress hit $597000.0 in Q4 2024 for Pony AI, up from $7000.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $597000.0 in Q4 2024 to a low of $7000.0 in Q4 2023.
- Historically, Construction in Progress has averaged $243000.0 across 3 years, with a median of $125000.0 in 2022.
- Biggest five-year swings in Construction in Progress: crashed 94.4% in 2023 and later surged 8428.57% in 2024.
- Year by year, Construction in Progress stood at $125000.0 in 2022, then plummeted by 94.4% to $7000.0 in 2023, then soared by 8428.57% to $597000.0 in 2024.
- Business Quant data shows Construction in Progress for PONY at $597000.0 in Q4 2024, $7000.0 in Q4 2023, and $125000.0 in Q4 2022.