Phoenix Asia Holdings PHOE
NASDAQ PHOE
$19.30 -0.62 (-3.11%)
At close: Sep 11, 2026 · 4:00 PM EDT

Phoenix Asia Holdings (PHOE) Work In Process (2024 - 2026)

Phoenix Asia Holdings' (PHOE) quarterly Work In Process came in at $431513.0 in Q1 2026, up 21.44% year-over-year from $355344.0 in Q1 2025, and up 21.44% quarter-over-quarter from $355344.0 in Q1 2025.

Analysis

Phoenix Asia Holdings (PHOE) Work In Process (2024 - 2026) Analysis & Trends

Phoenix Asia Holdings has disclosed Work In Process across 3 years of filings, most recently posting $431513.0 for Q1 2026.

  • In Q1 2026, Work In Process rose 21.44% year-over-year to $431513.0; the TTM figure through Mar 2026 stood at $431513.0 (up 21.44% YoY), while the FY2026 annual figure was $431513.0, up 21.44% from the prior year.
  • Work In Process came in at $431513.0 for Q1 2026 at Phoenix Asia Holdings, up from $355344.0 in the prior quarter.
  • In the past five years, Work In Process ranged from a high of $431513.0 in Q1 2026 to a low of $245913.0 in Q1 2024.
  • Average Work In Process over 3 years is $344256.7, with a median of $355344.0 recorded in 2025.
  • Year-over-year, Work In Process surged 44.5% in 2025 and grew 21.44% in 2026.
  • Over 3 years, Work In Process stood at $245913.0 in 2024, then jumped by 44.5% to $355344.0 in 2025, then gained by 21.44% to $431513.0 in 2026.
  • Per Business Quant data, the three most recent Work In Process figures were $431513.0 in Q1 2026, $355344.0 in Q1 2025, and $245913.0 in Q1 2024.
Peer Set

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr)
1 Ferrovial 40.46 Bn 37.11 Bn -
2 Emcor 34.53 Bn 33.61 Bn 1.02 Bn
3 Jacobs Solutions 16.62 Bn 15.43 Bn 810.70 Mn
4 Sterling Infrastructure 15.68 Bn 15.25 Bn 289.96 Mn
5 Aecom 8.18 Bn 7.37 Bn -34.04 Mn
6 Stantec 7.95 Bn 7.95 Bn 1.36 Bn
7 Fluor 7.35 Bn 4.40 Bn 179.00 Mn
8 Argan 5.81 Bn 5.26 Bn 74.22 Mn
9 Installed Building Products 5.43 Bn 5.03 Bn 258.90 Mn
10 Phoenix Asia Holdings 416.88 Mn 415.99 Mn -
Historic Data

Historic Data

Download Data
DateValue
Mar 31, 2026 431,513.00
Mar 31, 2025 355,344.00
Mar 31, 2024 245,913.00