Pacific Green Technologies (PGTK) Construction in Progress (2023 - 2024)
Pacific Green Technologies (PGTK) has disclosed Construction in Progress for 2 consecutive years, with $642000.0 as the latest value for Q1 2024.
- Quarterly Construction in Progress fell 87.44% to $642000.0 in Q1 2024 from the year-ago period, while the trailing twelve-month figure was $642000.0 through Mar 2024, down 87.44% year-over-year, with the annual reading at $642000.0 for FY2024, 87.44% down from the prior year.
- Construction in Progress for Q1 2024 was $642000.0 at Pacific Green Technologies, down from $5.1 million in the prior quarter.
- The five-year high for Construction in Progress was $5.1 million in Q1 2023, with the low at $642000.0 in Q1 2024.