Pangaea Logistics Solutions (PANL) Construction in Progress (2016 - 2019)
Pangaea Logistics Solutions (PANL) has disclosed Construction in Progress for 5 consecutive years, with $15.4 million as the latest value for Q4 2019.
- Quarterly Construction in Progress changed N/A to $15.4 million in Q4 2019 from the year-ago period, while the trailing twelve-month figure was $15.4 million through Dec 2019, changed N/A year-over-year, with the annual reading at $15.4 million for FY2019, N/A changed from the prior year.
- Construction in Progress hit $15.4 million in Q4 2019 for Pangaea Logistics Solutions, up from $7.8 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $42.5 million in Q4 2015 to a low of $7.7 million in Q2 2019.
- Historically, Construction in Progress has averaged $15.5 million across 3 years, with a median of $15.3 million in 2015.
- Biggest five-year swings in Construction in Progress: increased 10.49% in 2015 and later plummeted 56.75% in 2016.
- Year by year, Construction in Progress stood at $42.5 million in 2015, then tumbled by 56.75% to $18.4 million in 2016, then decreased by 16.46% to $15.4 million in 2019.
- Business Quant data shows Construction in Progress for PANL at $15.4 million in Q4 2019, $7.8 million in Q3 2019, and $7.7 million in Q2 2019.