Growth Metrics

Pangaea Logistics Solutions (PANL) Construction in Progress (2016 - 2019)

Pangaea Logistics Solutions' Construction in Progress history spans 5 years, with the latest figure at $15.4 million for Q4 2019.

  • For Q4 2019, Construction in Progress changed N/A year-over-year to $15.4 million; the TTM value through Dec 2019 reached $15.4 million, changed N/A, while the annual FY2019 figure was $15.4 million, N/A changed from the prior year.
  • Construction in Progress for Q4 2019 was $15.4 million at Pangaea Logistics Solutions, up from $7.8 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $42.5 million in Q4 2015 and bottomed at $7.7 million in Q2 2019.
  • The 3-year median for Construction in Progress is $15.3 million (2015), against an average of $15.5 million.
  • The largest annual shift saw Construction in Progress grew 10.49% in 2015 before it crashed 56.75% in 2016.
  • A 3-year view of Construction in Progress shows it stood at $42.5 million in 2015, then plummeted by 56.75% to $18.4 million in 2016, then dropped by 16.46% to $15.4 million in 2019.
  • Per Business Quant, the three most recent readings for PANL's Construction in Progress are $15.4 million (Q4 2019), $7.8 million (Q3 2019), and $7.7 million (Q2 2019).