Growth Metrics

One Stop Systems (OSS) Construction in Progress: 2018-2019

  • One Stop Systems' Construction in Progress was N/A to $4,432 in Q2 2019 from the same period last year, while for Jun 2019 it was $4,432, marking a year-over-year change of. This contributed to the annual value of $197,619 for FY2018, which is N/A change from last year.
  • One Stop Systems' Construction in Progress amounted to $4,432 in Q2 2019, which was down 99.32% from $649,623 recorded in Q1 2019.
  • One Stop Systems' 5-year Construction in Progress high stood at $649,623 for Q1 2019, and its period low was $4,432 during Q2 2019.
  • For the 2-year period, One Stop Systems' Construction in Progress averaged around $283,891, with its median value being $197,619 (2018).