Growth Metrics

One Stop Systems (OSS) Construction in Progress (2018 - 2019)

Historic Construction in Progress for One Stop Systems (OSS) over the last 2 years, with Q2 2019 value amounting to $4432.0.

  • One Stop Systems' Construction in Progress changed N/A to $4432.0 in Q2 2019 from the same period last year, while for Jun 2019 it was $4432.0, marking a year-over-year change of. This contributed to the annual value of $197619.0 for FY2018, which is N/A changed from last year.
  • One Stop Systems' Construction in Progress amounted to $4432.0 in Q2 2019.
  • One Stop Systems' 5-year Construction in Progress high stood at $649623.0 for Q1 2019, and its period low was $4432.0 during Q2 2019.