Cash Flow Statement
Growth Metrics

One Stop Systems (OSS) Construction in Progress (2018 - 2019)

One Stop Systems has reported Construction in Progress over the past 2 years, most recently at $4432.0 for Q2 2019.

  • For Q2 2019, Construction in Progress changed N/A year-over-year to $4432.0; the TTM value through Jun 2019 reached $4432.0, changed N/A, while the annual FY2018 figure was $197619.0, N/A changed from the prior year.
  • Construction in Progress for Q2 2019 was $4432.0 at One Stop Systems, down from $649623.0 in the prior quarter.
  • Over five years, Construction in Progress peaked at $649623.0 in Q1 2019 and troughed at $4432.0 in Q2 2019.