Growth Metrics

Oceaneering International (OII) Construction in Progress (2022 - 2024)

Historic Construction in Progress for Oceaneering International (OII) over the last 3 years, with Q4 2024 value amounting to $60.0 million.

  • Oceaneering International's Construction in Progress rose 909.09% to $60.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $60.0 million, marking a year-over-year increase of 909.09%. This contributed to the annual value of $60.0 million for FY2024, which is 909.09% up from last year.
  • According to the latest figures from Q4 2024, Oceaneering International's Construction in Progress is $60.0 million, which was up 909.09% from $55.0 million recorded in Q4 2023.
  • Oceaneering International's Construction in Progress' 5-year high stood at $60.0 million during Q4 2024, with a 5-year trough of $55.0 million in Q4 2023.
  • In the last 3 years, Oceaneering International's Construction in Progress had a median value of $58.0 million in 2022 and averaged $57.7 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first tumbled by 517.24% in 2023, then soared by 909.09% in 2024.
  • Over the past 3 years, Oceaneering International's Construction in Progress (Quarter) stood at $58.0 million in 2022, then fell by 5.17% to $55.0 million in 2023, then rose by 9.09% to $60.0 million in 2024.
  • Its Construction in Progress stands at $60.0 million for Q4 2024, versus $55.0 million for Q4 2023 and $58.0 million for Q4 2022.