Oceaneering International (OII) Construction in Progress (2022 - 2025)
Oceaneering International has reported Construction in Progress over the past 4 years, most recently at $67.0 million for Q4 2025.
- Quarterly Construction in Progress rose 11.67% to $67.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $67.0 million through Dec 2025, up 11.67% year-over-year, with the annual reading at $67.0 million for FY2025, 11.67% up from the prior year.
- Construction in Progress was $67.0 million for Q4 2025 at Oceaneering International, up from $60.0 million in the prior quarter.
- Over five years, Construction in Progress peaked at $67.0 million in Q4 2025 and troughed at $55.0 million in Q4 2023.
- The 4-year median for Construction in Progress is $59.0 million (2022), against an average of $60.0 million.
- Year-over-year, Construction in Progress fell 5.17% in 2023 and then increased 11.67% in 2025.
- A 4-year view of Construction in Progress shows it stood at $58.0 million in 2022, then fell by 5.17% to $55.0 million in 2023, then grew by 9.09% to $60.0 million in 2024, then rose by 11.67% to $67.0 million in 2025.
- Per Business Quant, the three most recent readings for OII's Construction in Progress are $67.0 million (Q4 2025), $60.0 million (Q4 2024), and $55.0 million (Q4 2023).