Oceaneering International (OII) Construction in Progress (2022 - 2025)
Oceaneering International (OII) has disclosed Construction in Progress for 3 consecutive years, with $60.0 million as the latest value for Q4 2024.
- On a quarterly basis, Construction in Progress rose 9.09% to $60.0 million in Q4 2024 year-over-year; TTM through Dec 2024 was $60.0 million, a 9.09% increase, with the full-year FY2024 number at $60.0 million, up 9.09% from a year prior.
- Construction in Progress was $60.0 million for Q4 2024 at Oceaneering International, up from $55.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $60.0 million in Q4 2024 to a low of $55.0 million in Q4 2023.
- A 3-year average of $57.7 million and a median of $58.0 million in 2022 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: fell 5.17% in 2023, then rose 9.09% in 2024.
- Oceaneering International's Construction in Progress stood at $58.0 million in 2022, then dropped by 5.17% to $55.0 million in 2023, then increased by 9.09% to $60.0 million in 2024.
- Per Business Quant, the three most recent readings for OII's Construction in Progress are $60.0 million (Q4 2024), $55.0 million (Q4 2023), and $58.0 million (Q4 2022).