Oceaneering International (OII) Construction in Progress (2022 - 2025)
Oceaneering International (OII) has disclosed Construction in Progress for 4 consecutive years, with $67.0 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 11.67% to $67.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $67.0 million through Dec 2025, up 11.67% year-over-year, with the annual reading at $67.0 million for FY2025, 11.67% up from the prior year.
- Construction in Progress for Q4 2025 was $67.0 million at Oceaneering International, up from $60.0 million in the prior quarter.
- The five-year high for Construction in Progress was $67.0 million in Q4 2025, with the low at $55.0 million in Q4 2023.
- Average Construction in Progress over 4 years is $60.0 million, with a median of $59.0 million recorded in 2022.
- The sharpest move saw Construction in Progress dropped 5.17% in 2023, then rose 11.67% in 2025.
- Over 4 years, Construction in Progress stood at $58.0 million in 2022, then decreased by 5.17% to $55.0 million in 2023, then rose by 9.09% to $60.0 million in 2024, then increased by 11.67% to $67.0 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $67.0 million, $60.0 million, and $55.0 million for Q4 2025, Q4 2024, and Q4 2023 respectively.