Growth Metrics

Omega Flex (OFLX) Construction in Progress (2016 - 2025)

Omega Flex's Construction in Progress history spans 14 years, with the latest figure at $1.2 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 248.97% to $1.2 million in Q4 2025 year-over-year; TTM through Dec 2025 was $1.2 million, a 248.97% increase, with the full-year FY2025 number at $1.2 million, up 248.97% from a year prior.
  • Construction in Progress hit $1.2 million in Q4 2025 for Omega Flex, up from $341000.0 in the prior quarter.
  • Over the last five years, Construction in Progress for OFLX hit a ceiling of $1.3 million in Q4 2023 and a floor of $112000.0 in Q4 2021.
  • Historically, Construction in Progress has averaged $705400.0 across 5 years, with a median of $535000.0 in 2022.
  • Biggest five-year swings in Construction in Progress: surged 377.68% in 2022 and later plummeted 74.72% in 2024.
  • Tracing OFLX's Construction in Progress over 5 years: stood at $112000.0 in 2021, then surged by 377.68% to $535000.0 in 2022, then skyrocketed by 152.15% to $1.3 million in 2023, then crashed by 74.72% to $341000.0 in 2024, then skyrocketed by 248.97% to $1.2 million in 2025.
  • Business Quant data shows Construction in Progress for OFLX at $1.2 million in Q4 2025, $341000.0 in Q4 2024, and $1.3 million in Q4 2023.