Omega Flex (OFLX) Construction in Progress (2016 - 2025)
Omega Flex (OFLX) has disclosed Construction in Progress for 14 consecutive years, with $1.2 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 248.97% to $1.2 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $1.2 million through Dec 2025, up 248.97% year-over-year, with the annual reading at $1.2 million for FY2025, 248.97% up from the prior year.
- Construction in Progress hit $1.2 million in Q4 2025 for Omega Flex, up from $341000.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $1.3 million in Q4 2023 to a low of $112000.0 in Q4 2021.
- Historically, Construction in Progress has averaged $705400.0 across 5 years, with a median of $535000.0 in 2022.
- Biggest five-year swings in Construction in Progress: surged 377.68% in 2022 and later plummeted 74.72% in 2024.
- Year by year, Construction in Progress stood at $112000.0 in 2021, then soared by 377.68% to $535000.0 in 2022, then surged by 152.15% to $1.3 million in 2023, then plummeted by 74.72% to $341000.0 in 2024, then surged by 248.97% to $1.2 million in 2025.
- Business Quant data shows Construction in Progress for OFLX at $1.2 million in Q4 2025, $341000.0 in Q4 2024, and $1.3 million in Q4 2023.