Growth Metrics

Omega Flex (OFLX) Construction in Progress (2016 - 2025)

Omega Flex's Construction in Progress history spans 13 years, with the latest figure at $341000.0 for Q4 2024.

  • For Q4 2024, Construction in Progress fell 74.72% year-over-year to $341000.0; the TTM value through Dec 2024 reached $341000.0, down 74.72%, while the annual FY2024 figure was $341000.0, 74.72% down from the prior year.
  • Construction in Progress for Q4 2024 was $341000.0 at Omega Flex, down from $1.3 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $1.3 million in Q4 2023 and bottomed at $112000.0 in Q4 2021.
  • The 5-year median for Construction in Progress is $341000.0 (2024), against an average of $514200.0.
  • The largest annual shift saw Construction in Progress skyrocketed 377.68% in 2022 before it crashed 74.72% in 2024.
  • A 5-year view of Construction in Progress shows it stood at $234000.0 in 2020, then tumbled by 52.14% to $112000.0 in 2021, then surged by 377.68% to $535000.0 in 2022, then skyrocketed by 152.15% to $1.3 million in 2023, then crashed by 74.72% to $341000.0 in 2024.
  • Per Business Quant, the three most recent readings for OFLX's Construction in Progress are $341000.0 (Q4 2024), $1.3 million (Q4 2023), and $535000.0 (Q4 2022).