Oil-Dri Corp of America (ODC) Construction in Progress (2016 - 2025)
Oil-Dri Corp of America (ODC) has disclosed Construction in Progress for 15 consecutive years, with $25.1 million as the latest value for Q3 2025.
- Quarterly Construction in Progress rose 19.91% to $25.1 million in Q3 2025 from the year-ago period, while the trailing twelve-month figure was $25.1 million through Jul 2025, up 19.91% year-over-year, with the annual reading at $25.1 million for FY2025, 19.91% up from the prior year.
- Construction in Progress for Q3 2025 was $25.1 million at Oil-Dri Corp of America, up from $21.0 million in the prior quarter.
- The five-year high for Construction in Progress was $25.1 million in Q3 2025, with the low at $14.6 million in Q3 2021.
- Average Construction in Progress over 5 years is $20.2 million, with a median of $21.0 million recorded in 2024.
- The sharpest move saw Construction in Progress surged 67.47% in 2022, then plummeted 35.27% in 2023.
- Over 5 years, Construction in Progress stood at $14.6 million in 2021, then soared by 67.47% to $24.5 million in 2022, then plummeted by 35.27% to $15.9 million in 2023, then surged by 32.28% to $21.0 million in 2024, then increased by 19.91% to $25.1 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $25.1 million, $21.0 million, and $15.9 million for Q3 2025, Q3 2024, and Q3 2023 respectively.