NXT Energy Solutions (NSFDF) Work In Process (2016)
NXT Energy Solutions filings provide 7 years of Work In Process readings, the most recent being $303506.4 for Q4 2016.
- On a quarterly basis, Work In Process rose 200.05% to $303506.4 in Q4 2016 year-over-year; TTM through Dec 2016 was $303506.4, a 200.05% increase, with the full-year FY2016 number at $303506.4, up 200.05% from a year prior.
- Work In Process hit $303506.4 in Q4 2016 for NXT Energy Solutions, down from $310558.6 in the prior quarter.
- In the past five years, Work In Process ranged from a high of $3.1 million in Q3 2015 to a low of -$299.8 billion in Q4 2014.
- Median Work In Process over the past 5 years was $307032.5 (2016), compared with a mean of -$30.0 billion.
- Biggest five-year swings in Work In Process: skyrocketed 1668.37% in 2012 and later plummeted 104893891.68% in 2014.
- NXT Energy Solutions' Work In Process stood at $985442.9 in 2012, then tumbled by 70.99% to $285853.0 in 2013, then plummeted by 104893891.68% to -$299.8 billion in 2014, then surged by 100.0% to -$303361.8 in 2015, then surged by 200.05% to $303506.4 in 2016.
- The last three reported values for Work In Process were $303506.4 (Q4 2016), $310558.6 (Q3 2016), and -$303361.8 (Q4 2015) per Business Quant data.