Growth Metrics

Noah Holdings (NOAH) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Noah Holdings (NOAH) over the last 14 years, with Q4 2024 value amounting to $2.5 million.

  • Noah Holdings' Construction in Progress fell 2080.78% to $2.5 million in Q4 2024 from the same period last year, while for Dec 2024 it was $2.5 million, marking a year-over-year decrease of 2080.78%. This contributed to the annual value of $2.5 million for FY2024, which is 2315.76% down from last year.
  • According to the latest figures from Q4 2024, Noah Holdings' Construction in Progress is $2.5 million, which was down 2080.78% from $3.2 million recorded in Q4 2023.
  • In the past 5 years, Noah Holdings' Construction in Progress ranged from a high of $5.8 million in Q4 2022 and a low of $2.5 million during Q4 2024
  • Moreover, its 5-year median value for Construction in Progress was $3.2 million (2020), whereas its average is $3.5 million.
  • In the last 5 years, Noah Holdings' Construction in Progress soared by 12236.22% in 2022 and then crashed by 4460.68% in 2023.
  • Noah Holdings' Construction in Progress (Quarter) stood at $3.2 million in 2020, then decreased by 18.43% to $2.6 million in 2021, then skyrocketed by 122.36% to $5.8 million in 2022, then crashed by 44.61% to $3.2 million in 2023, then dropped by 20.81% to $2.5 million in 2024.
  • Its last three reported values are $2.5 million in Q4 2024, $3.2 million for Q4 2023, and $5.8 million during Q4 2022.