Growth Metrics

New Fortress Energy (NFE) Construction in Progress (2018 - 2025)

New Fortress Energy has reported Construction in Progress over the past 8 years, most recently at $3.6 billion for Q4 2025.

  • Quarterly Construction in Progress rose 1.9% to $3.6 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $3.6 billion through Dec 2025, up 1.9% year-over-year, with the annual reading at $3.6 billion for FY2025, 1.9% up from the prior year.
  • Construction in Progress was $3.6 billion for Q4 2025 at New Fortress Energy, down from $4.3 billion in the prior quarter.
  • Over five years, Construction in Progress peaked at $7.1 billion in Q3 2024 and troughed at $337.7 million in Q1 2021.
  • The 5-year median for Construction in Progress is $3.6 billion (2024), against an average of $3.3 billion.
  • Year-over-year, Construction in Progress skyrocketed 372.5% in 2021 and then crashed 39.09% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $1.0 billion in 2021, then skyrocketed by 131.69% to $2.4 billion in 2022, then soared by 120.89% to $5.3 billion in 2023, then tumbled by 33.98% to $3.5 billion in 2024, then increased by 1.9% to $3.6 billion in 2025.
  • Per Business Quant, the three most recent readings for NFE's Construction in Progress are $3.6 billion (Q4 2025), $4.3 billion (Q3 2025), and $4.1 billion (Q2 2025).