Growth Metrics

New Fortress Energy (NFE) Construction in Progress (2018 - 2025)

New Fortress Energy (NFE) has disclosed Construction in Progress for 8 consecutive years, with $4.2 billion as the latest value for Q3 2025.

  • On a quarterly basis, Construction in Progress fell 40.11% to $4.2 billion in Q3 2025 year-over-year; TTM through Sep 2025 was $4.2 billion, a 40.11% decrease, with the full-year FY2024 number at $3.6 billion, down 33.17% from a year prior.
  • Construction in Progress was $4.2 billion for Q3 2025 at New Fortress Energy, up from $4.1 billion in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $7.1 billion in Q3 2024 to a low of $337.7 million in Q1 2021.
  • A 5-year average of $3.3 billion and a median of $3.6 billion in 2024 define the central range for Construction in Progress.
  • Peak YoY movement for Construction in Progress: skyrocketed 372.5% in 2021, then plummeted 40.11% in 2025.
  • New Fortress Energy's Construction in Progress stood at $1.0 billion in 2021, then surged by 131.69% to $2.4 billion in 2022, then soared by 121.13% to $5.3 billion in 2023, then tumbled by 33.17% to $3.6 billion in 2024, then increased by 18.14% to $4.2 billion in 2025.
  • Per Business Quant, the three most recent readings for NFE's Construction in Progress are $4.2 billion (Q3 2025), $4.1 billion (Q2 2025), and $3.9 billion (Q1 2025).