Growth Metrics

Metallus (MTUS) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Metallus (MTUS) over the last 12 years, with Q4 2024 value amounting to $92.1 million.

  • Metallus' Construction in Progress rose 5531.2% to $92.1 million in Q4 2024 from the same period last year, while for Dec 2024 it was $92.1 million, marking a year-over-year increase of 5531.2%. This contributed to the annual value of $92.1 million for FY2024, which is 5531.2% up from last year.
  • As of Q4 2024, Metallus' Construction in Progress stood at $92.1 million, which was up 5531.2% from $59.3 million recorded in Q4 2023.
  • Metallus' 5-year Construction in Progress high stood at $92.1 million for Q4 2024, and its period low was $9.6 million during Q4 2021.
  • Over the past 5 years, Metallus' median Construction in Progress value was $30.8 million (recorded in 2022), while the average stood at $40.6 million.
  • Per our database at Business Quant, Metallus' Construction in Progress crashed by 6440.13% in 2020 and then skyrocketed by 22083.33% in 2022.
  • Over the past 5 years, Metallus' Construction in Progress (Quarter) stood at $11.0 million in 2020, then decreased by 12.73% to $9.6 million in 2021, then soared by 220.83% to $30.8 million in 2022, then soared by 92.53% to $59.3 million in 2023, then skyrocketed by 55.31% to $92.1 million in 2024.
  • Its Construction in Progress was $92.1 million in Q4 2024, compared to $59.3 million in Q4 2023 and $30.8 million in Q4 2022.