MainStreet Bancshares (MNSB) Construction in Progress: 2021
- MainStreet Bancshares' Construction in Progress was N/A to $142,000 in Q4 2021 from the same period last year, while for Dec 2021 it was $142,000, marking a year-over-year change of. This contributed to the annual value of $142,000 for FY2021, which is N/A change from last year.
- As of Q4 2021, MainStreet Bancshares' Construction in Progress stood at $142,000.
- In the past 5 years, MainStreet Bancshares' Construction in Progress ranged from a high of $142,000 in Q4 2021 and a low of $142,000 during Q4 2021.
- Its 1-year average for Construction in Progress is $142,000, with a median of $142,000 in 2021.