Lantronix (LTRX) Construction in Progress (2011)

Lantronix (LTRX) reported Construction in Progress of $99000.0 for Q2 2011.

Lantronix (LTRX) Construction in Progress (2011) Analysis & Trends

Lantronix (LTRX) has 1 years of Construction in Progress data on file, last reported at $99000.0 in Q2 2011.

  • For the quarter ending Q2 2011, Construction in Progress changed N/A year-over-year to $99000.0; the trailing twelve-month figure through Jun 2011 stood at $99000.0 (changed N/A YoY), and the FY2011 full-year result was $99000.0, changed N/A from the prior year.
  • Construction in Progress was little changed at $99000.0 in Q2 2011.
  • In the past five years, Construction in Progress ranged from a high of $99000.0 in Q2 2011 to a low of $99000.0 in Q2 2011.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr) Construction in Progress (Qtr)
1 Cisco Systems 444.27 Bn 427.63 Bn 10.08 Bn -
2 Motorola Solutions 68.42 Bn 67.56 Bn 1.36 Bn -
3 Hewlett Packard Enterprise 63.57 Bn 58.72 Bn 9.10 Bn -
4 Lumentum Holdings 59.61 Bn 56.43 Bn 357.00 Mn -
5 Ciena 57.62 Bn 56.33 Bn 625.52 Mn -
6 Nokia 52.70 Bn 45.22 Bn 9.86 Bn -
7 Ubiquiti 32.00 Bn 31.63 Bn 370.71 Mn -
8 AST SpaceMobile 17.20 Bn 17.78 Bn 3.67 Mn 1.32 Bn
9 Zebra Technologies 12.59 Bn 12.48 Bn 742.00 Mn -
10 Lantronix 222.58 Mn 199.06 Mn 13.01 Mn -

Historic Data

Download Data
DateValue
Jun 30, 2011 99,000.00