Lantronix (LTRX) Construction in Progress (2011)

Lantronix's (LTRX) quarterly Construction in Progress came in at $99000.0 in Q2 2011.

Lantronix (LTRX) Construction in Progress (2011) Analysis & Trends

Lantronix has disclosed Construction in Progress across 1 years of filings, most recently posting $99000.0 for Q2 2011.

  • Construction in Progress for Q2 2011 came in at $99000.0, changed N/A year-over-year; the trailing twelve-month figure through Jun 2011 was $99000.0 (changed N/A YoY), and the FY2011 annual result was $99000.0, changed N/A from the prior year.
  • Construction in Progress came in at $99000.0 for Q2 2011 at Lantronix.
  • In the past five years, Construction in Progress ranged from a high of $99000.0 in Q2 2011 to a low of $99000.0 in Q2 2011.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr) Construction in Progress (Qtr)
1 Cisco Systems 469.93 Bn 453.29 Bn 10.08 Bn -
2 Motorola Solutions 65.69 Bn 64.83 Bn 1.36 Bn -
3 Hewlett Packard Enterprise 63.18 Bn 58.34 Bn 8.25 Bn -
4 Ciena 60.70 Bn 59.40 Bn 625.52 Mn -
5 Lumentum Holdings 60.35 Bn 57.18 Bn 357.00 Mn -
6 Ubiquiti 35.71 Bn 35.34 Bn 370.71 Mn -
7 AST SpaceMobile 23.10 Bn 23.68 Bn -69.36 Mn 64.89 Mn
8 Applied Optoelectronics 12.30 Bn 11.86 Bn 43.92 Mn -
9 Zebra Technologies 11.58 Bn 11.47 Bn 742.00 Mn -
10 Lantronix 261.03 Mn 237.52 Mn 13.01 Mn -

Historic Data

Download Data
DateValue
Jun 30, 2011 99,000.00