Comstock (LODE) Construction in Progress (2021 - 2023)
Comstock (LODE) has disclosed Construction in Progress for 5 consecutive years, with $443623.0 as the latest value for Q1 2023.
- Quarterly Construction in Progress fell 88.97% to $443623.0 in Q1 2023 from the year-ago period, while the trailing twelve-month figure was $443623.0 through Mar 2023, down 88.97% year-over-year, with the annual reading at $3.2 million for FY2021, N/A changed from the prior year.
- Construction in Progress hit $443623.0 in Q1 2023 for Comstock, down from $3.5 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $4.0 million in Q1 2022 to a low of $443623.0 in Q1 2023.
- Historically, Construction in Progress has averaged $2.9 million across 3 years, with a median of $3.3 million in 2022.
- Biggest YoY gain for Construction in Progress was 88.97% in 2023; the steepest drop was 88.97% in 2023.
- Year by year, Construction in Progress stood at $3.2 million in 2021, then increased by 9.32% to $3.5 million in 2022, then tumbled by 87.4% to $443623.0 in 2023.
- Business Quant data shows Construction in Progress for LODE at $443623.0 in Q1 2023, $3.5 million in Q3 2022, and $3.3 million in Q2 2022.