Lkq (LKQ) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Lkq (LKQ) over the last 14 years, with Q4 2024 value amounting to $63.0 million.
- Lkq's Construction in Progress fell 5227.27% to $63.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $63.0 million, marking a year-over-year decrease of 5227.27%. This contributed to the annual value of $63.0 million for FY2024, which is 5227.27% down from last year.
- According to the latest figures from Q4 2024, Lkq's Construction in Progress is $63.0 million, which was down 5227.27% from $132.0 million recorded in Q4 2023.
- Lkq's Construction in Progress' 5-year high stood at $159.0 million during Q4 2021, with a 5-year trough of $52.0 million in Q4 2022.
- Moreover, its 5-year median value for Construction in Progress was $76.9 million (2020), whereas its average is $96.6 million.
- As far as peak fluctuations go, Lkq's Construction in Progress plummeted by 6729.56% in 2022, and later surged by 15384.62% in 2023.
- Lkq's Construction in Progress (Quarter) stood at $76.9 million in 2020, then skyrocketed by 106.7% to $159.0 million in 2021, then tumbled by 67.3% to $52.0 million in 2022, then skyrocketed by 153.85% to $132.0 million in 2023, then plummeted by 52.27% to $63.0 million in 2024.
- Its Construction in Progress was $63.0 million in Q4 2024, compared to $132.0 million in Q4 2023 and $52.0 million in Q4 2022.