Growth Metrics

Lkq (LKQ) Construction in Progress (2016 - 2025)

Lkq has reported Construction in Progress over the past 15 years, most recently at $39.0 million for Q4 2025.

  • Quarterly results put Construction in Progress at $39.0 million for Q4 2025, down 35.0% from a year ago — trailing twelve months through Dec 2025 was $39.0 million (down 35.0% YoY), and the annual figure for FY2025 was $39.0 million, down 35.0%.
  • Construction in Progress for Q4 2025 was $39.0 million at Lkq, down from $60.0 million in the prior quarter.
  • Over the last five years, Construction in Progress for LKQ hit a ceiling of $159.0 million in Q4 2021 and a floor of $39.0 million in Q4 2025.
  • Median Construction in Progress over the past 5 years was $60.0 million (2024), compared with a mean of $88.4 million.
  • Biggest five-year swings in Construction in Progress: plummeted 67.3% in 2022 and later skyrocketed 153.85% in 2023.
  • Lkq's Construction in Progress stood at $159.0 million in 2021, then plummeted by 67.3% to $52.0 million in 2022, then soared by 153.85% to $132.0 million in 2023, then plummeted by 54.55% to $60.0 million in 2024, then plummeted by 35.0% to $39.0 million in 2025.
  • The last three reported values for Construction in Progress were $39.0 million (Q4 2025), $60.0 million (Q4 2024), and $132.0 million (Q4 2023) per Business Quant data.