AEye (LIDR) Work In Process (2023 - 2025)

AEye's Work In Process history spans 3 years, with the latest figure at $78000.0 for Q4 2025.

  • Quarterly Work In Process changed N/A to $78000.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $78000.0 through Dec 2025, changed N/A year-over-year, with the annual reading at $78000.0 for FY2025, N/A changed from the prior year.
  • Work In Process came in at $78000.0 for Q4 2025, down from $418000.0 in the prior quarter.
  • In the past five years, Work In Process ranged from a high of $418000.0 in Q3 2025 to a low of $65000.0 in Q3 2024.
  • The 3-year median for Work In Process is $123000.0 (2024), against an average of $168600.0.
  • The largest YoY upside for Work In Process was 543.08% in 2025 against a maximum downside of 543.08% in 2025.
  • AEye's Work In Process stood at $159000.0 in 2023, then plummeted by 59.12% to $65000.0 in 2024, then rose by 20.0% to $78000.0 in 2025.
  • Per Business Quant, the three most recent readings for LIDR's Work In Process are $78000.0 (Q4 2025), $418000.0 (Q3 2025), and $65000.0 (Q3 2024).