AEye (LIDR) Work In Process (2023 - 2025)

AEye has reported Work In Process over the past 3 years, most recently at $78000.0 for Q4 2025.

  • Quarterly results put Work In Process at $78000.0 for Q4 2025, changed N/A from a year ago — trailing twelve months through Dec 2025 was $78000.0 (changed N/A YoY), and the annual figure for FY2025 was $78000.0, changed.
  • Work In Process for Q4 2025 was $78000.0 at AEye, down from $418000.0 in the prior quarter.
  • Over the last five years, Work In Process for LIDR hit a ceiling of $418000.0 in Q3 2025 and a floor of $65000.0 in Q3 2024.
  • Median Work In Process over the past 3 years was $123000.0 (2024), compared with a mean of $168600.0.
  • Peak annual rise in Work In Process hit 543.08% in 2025, while the deepest fall reached 543.08% in 2025.
  • AEye's Work In Process stood at $159000.0 in 2023, then crashed by 59.12% to $65000.0 in 2024, then increased by 20.0% to $78000.0 in 2025.
  • The last three reported values for Work In Process were $78000.0 (Q4 2025), $418000.0 (Q3 2025), and $65000.0 (Q3 2024) per Business Quant data.