AEye (LIDR) Work In Process (2023 - 2025)
AEye (LIDR) has disclosed Work In Process for 3 consecutive years, with $418000.0 as the latest value for Q3 2025.
- On a quarterly basis, Work In Process rose 543.08% to $418000.0 in Q3 2025 year-over-year; TTM through Sep 2025 was $418000.0, a 543.08% increase, with the full-year FY2023 number at $159000.0, changed N/A from a year prior.
- Work In Process was $418000.0 for Q3 2025 at AEye, up from $65000.0 in the prior quarter.
- In the past five years, Work In Process ranged from a high of $418000.0 in Q3 2025 to a low of $65000.0 in Q3 2024.
- A 3-year average of $191250.0 and a median of $141000.0 in 2023 define the central range for Work In Process.
- Biggest YoY gain for Work In Process was 543.08% in 2025; the steepest drop was 543.08% in 2025.
- AEye's Work In Process stood at $159000.0 in 2023, then plummeted by 59.12% to $65000.0 in 2024, then surged by 543.08% to $418000.0 in 2025.
- Per Business Quant, the three most recent readings for LIDR's Work In Process are $418000.0 (Q3 2025), $65000.0 (Q3 2024), and $123000.0 (Q2 2024).