Lucas GC (LGCL) Construction in Progress (2024 - 2025)

Lucas GC (LGCL) has disclosed Construction in Progress for 2 consecutive years, with $4.9 million as the latest value for Q4 2025.

  • For Q4 2025, Construction in Progress rose 8.44% year-over-year to $4.9 million; the TTM value through Dec 2025 reached $4.9 million, up 8.44%, while the annual FY2025 figure was $5.0 million, 11.76% up from the prior year.
  • Construction in Progress was $4.9 million for Q4 2025 at Lucas GC, up from $4.5 million in the prior quarter.
  • The five-year high for Construction in Progress was $4.9 million in Q4 2025, with the low at $4.5 million in Q4 2024.