Growth Metrics

SemiLEDs (LEDS) Construction in Progress (2018 - 2019)

SemiLEDs' Construction in Progress history spans 2 years, with the latest figure at $12000.0 for Q1 2019.

  • Quarterly results put Construction in Progress at $12000.0 for Q1 2019, changed N/A from a year ago — trailing twelve months through Feb 2019 was $12000.0 (changed N/A YoY), and the annual figure for FY2018 was $289000.0, changed.
  • Construction in Progress for Q1 2019 was $12000.0 at SemiLEDs, down from $289000.0 in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $289000.0 in Q3 2018 to a low of $12000.0 in Q1 2019.