Lakeland Industries (LAKE) Construction in Progress (2017 - 2026)
Lakeland Industries filings provide 14 years of Construction in Progress readings, the most recent being $496000.0 for Q1 2026.
- On a quarterly basis, Construction in Progress fell 48.87% to $496000.0 in Q1 2026 year-over-year; TTM through Jan 2026 was $496000.0, a 48.87% decrease, with the full-year FY2026 number at $496000.0, down 48.87% from a year prior.
- Construction in Progress reached $496000.0 in Q1 2026 per LAKE's latest filing, down from $970000.0 in the prior quarter.
- The five-year high for Construction in Progress was $1.1 million in Q1 2024, with the low at $32000.0 in Q1 2022.
- A 5-year average of $716000.0 and a median of $970000.0 in 2025 define the central range for Construction in Progress.
- Year-over-year, Construction in Progress tumbled 66.67% in 2022 and then surged 3028.12% in 2023.
- Year by year, Construction in Progress stood at $32000.0 in 2022, then surged by 3028.12% to $1.0 million in 2023, then grew by 7.99% to $1.1 million in 2024, then dropped by 10.27% to $970000.0 in 2025, then tumbled by 48.87% to $496000.0 in 2026.
- Per Business Quant, the three most recent readings for LAKE's Construction in Progress are $496000.0 (Q1 2026), $970000.0 (Q1 2025), and $1.1 million (Q1 2024).