Fst (KBSX) Construction in Progress (2023 - 2025)

Fst (KBSX) has disclosed Construction in Progress for 3 consecutive years, with $1.0 million as the latest value for Q4 2025.

  • For Q4 2025, Construction in Progress rose 3.84% year-over-year to $1.0 million; the TTM value through Dec 2025 reached $1.0 million, up 3.84%, while the annual FY2025 figure was $1.0 million, 3.84% up from the prior year.
  • Construction in Progress was $1.0 million for Q4 2025 at Fst, up from $971267.0 in the prior quarter.
  • The five-year high for Construction in Progress was $1.6 million in Q4 2023, with the low at $971267.0 in Q4 2024.
  • Historically, Construction in Progress has averaged $1.2 million across 3 years, with a median of $1.0 million in 2025.
  • The largest annual shift saw Construction in Progress crashed 39.02% in 2024 before it grew 3.84% in 2025.
  • Over 3 years, Construction in Progress stood at $1.6 million in 2023, then crashed by 39.02% to $971267.0 in 2024, then increased by 3.84% to $1.0 million in 2025.
  • Per Business Quant database, its latest 3 readings for Construction in Progress were $1.0 million in Q4 2025, $971267.0 in Q4 2024, and $1.6 million in Q4 2023.