Kaiser Aluminum (KALU) Construction in Progress (2016 - 2025)
Kaiser Aluminum's Construction in Progress history spans 16 years, with the latest figure at $66.7 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 77.58% year-over-year to $66.7 million; the TTM value through Dec 2025 reached $66.7 million, down 77.58%, while the annual FY2025 figure was $66.7 million, 77.58% down from the prior year.
- Construction in Progress reached $66.7 million in Q4 2025 per KALU's latest filing, down from $128.7 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $332.4 million in Q1 2025 to a low of $66.7 million in Q4 2025.
- Average Construction in Progress over 5 years is $155.5 million, with a median of $139.0 million recorded in 2022.
- Peak YoY movement for Construction in Progress: soared 115.45% in 2021, then crashed 77.58% in 2025.
- A 5-year view of Construction in Progress shows it stood at $75.3 million in 2021, then surged by 87.65% to $141.3 million in 2022, then rose by 22.93% to $173.7 million in 2023, then skyrocketed by 71.27% to $297.5 million in 2024, then plummeted by 77.58% to $66.7 million in 2025.
- Per Business Quant, the three most recent readings for KALU's Construction in Progress are $66.7 million (Q4 2025), $128.7 million (Q3 2025), and $110.4 million (Q2 2025).