Growth Metrics

Johnson Outdoors (JOUT) Work In Process (2016 - 2017)

Johnson Outdoors (JOUT) has disclosed Work In Process for 7 consecutive years, with $161000.0 as the latest value for Q1 2017.

  • Quarterly Work In Process rose 3.87% to $161000.0 in Q1 2017 from the year-ago period, while the trailing twelve-month figure was $161000.0 through Mar 2017, up 3.87% year-over-year, with the annual reading at $34000.0 for FY2016, 41.67% up from the prior year.
  • Work In Process hit $161000.0 in Q1 2017 for Johnson Outdoors, down from $307000.0 in the prior quarter.
  • In the past five years, Work In Process ranged from a high of $654000.0 in Q1 2013 to a low of $24000.0 in Q4 2015.
  • Historically, Work In Process has averaged $245823.5 across 5 years, with a median of $203000.0 in 2016.
  • Biggest five-year swings in Work In Process: crashed 85.05% in 2013 and later surged 51.23% in 2016.
  • Year by year, Work In Process stood at $344000.0 in 2013, then crashed by 79.07% to $72000.0 in 2014, then plummeted by 66.67% to $24000.0 in 2015, then surged by 1179.17% to $307000.0 in 2016, then tumbled by 47.56% to $161000.0 in 2017.
  • Business Quant data shows Work In Process for JOUT at $161000.0 in Q1 2017, $307000.0 in Q4 2016, and $34000.0 in Q3 2016.