J.Jill (JILL) Construction in Progress (2017 - 2025)
Historic Construction in Progress for J.Jill (JILL) over the last 9 years, with Q1 2025 value amounting to $8.3 million.
- J.Jill's Construction in Progress rose 12364.96% to $8.3 million in Q1 2025 from the same period last year, while for Feb 2025 it was $8.3 million, marking a year-over-year increase of 12364.96%. This contributed to the annual value of $8.3 million for FY2025, which is 12364.96% up from last year.
- Latest data reveals that J.Jill reported Construction in Progress of $8.3 million as of Q1 2025, which was up 12364.96% from $3.7 million recorded in Q1 2024.
- Over the past 5 years, J.Jill's Construction in Progress peaked at $10.1 million during Q1 2023, and registered a low of $922000.0 during Q1 2021.
- In the last 5 years, J.Jill's Construction in Progress had a median value of $3.7 million in 2024 and averaged $5.3 million.
- In the last 5 years, J.Jill's Construction in Progress crashed by 7334.49% in 2021 and then soared by 26203.9% in 2022.
- J.Jill's Construction in Progress (Quarter) stood at $922000.0 in 2021, then surged by 262.04% to $3.3 million in 2022, then surged by 203.74% to $10.1 million in 2023, then tumbled by 63.3% to $3.7 million in 2024, then skyrocketed by 123.65% to $8.3 million in 2025.
- Its last three reported values are $8.3 million in Q1 2025, $3.7 million for Q1 2024, and $10.1 million during Q1 2023.