J.Jill (JILL) Construction in Progress (2017 - 2026)
J.Jill has reported Construction in Progress over the past 10 years, most recently at $6.6 million for Q1 2026.
- Quarterly results put Construction in Progress at $6.6 million for Q1 2026, down 21.12% from a year ago — trailing twelve months through Jan 2026 was $6.6 million (down 21.12% YoY), and the annual figure for FY2026 was $6.6 million, down 21.12%.
- Construction in Progress for Q1 2026 was $6.6 million at J.Jill, down from $8.3 million in the prior quarter.
- Over the last five years, Construction in Progress for JILL hit a ceiling of $10.1 million in Q1 2023 and a floor of $3.3 million in Q1 2022.
- Median Construction in Progress over the past 5 years was $6.6 million (2026), compared with a mean of $6.4 million.
- Biggest five-year swings in Construction in Progress: skyrocketed 262.04% in 2022 and later tumbled 63.3% in 2024.
- J.Jill's Construction in Progress stood at $3.3 million in 2022, then surged by 203.74% to $10.1 million in 2023, then tumbled by 63.3% to $3.7 million in 2024, then soared by 123.65% to $8.3 million in 2025, then decreased by 21.12% to $6.6 million in 2026.
- The last three reported values for Construction in Progress were $6.6 million (Q1 2026), $8.3 million (Q1 2025), and $3.7 million (Q1 2024) per Business Quant data.