J.Jill (JILL) Construction in Progress (2017 - 2025)
Historic Construction in Progress for J.Jill (JILL) over the last 9 years, with Q1 2025 value amounting to $8.3 million.
- J.Jill's Construction in Progress rose 12364.96% to $8.3 million in Q1 2025 from the same period last year, while for Feb 2025 it was $8.3 million, marking a year-over-year increase of 12364.96%. This contributed to the annual value of $8.3 million for FY2025, which is 12364.96% up from last year.
- Latest data reveals that J.Jill reported Construction in Progress of $8.3 million as of Q1 2025, which was up 12364.96% from $3.7 million recorded in Q1 2024.
- J.Jill's Construction in Progress' 5-year high stood at $10.1 million during Q1 2023, with a 5-year trough of $922000.0 in Q1 2021.
- Its 5-year average for Construction in Progress is $5.3 million, with a median of $3.7 million in 2024.
- Per our database at Business Quant, J.Jill's Construction in Progress tumbled by 7334.49% in 2021 and then surged by 26203.9% in 2022.
- Quarter analysis of 5 years shows J.Jill's Construction in Progress stood at $922000.0 in 2021, then skyrocketed by 262.04% to $3.3 million in 2022, then skyrocketed by 203.74% to $10.1 million in 2023, then plummeted by 63.3% to $3.7 million in 2024, then soared by 123.65% to $8.3 million in 2025.
- Its Construction in Progress was $8.3 million in Q1 2025, compared to $3.7 million in Q1 2024 and $10.1 million in Q1 2023.