JBT Marel (JBTM) Construction in Progress (2016 - 2020)
Historic Construction in Progress for JBT Marel (JBTM) over the last 12 years, with Q4 2020 value amounting to $21.1 million.
- JBT Marel's Construction in Progress fell 2156.13% to $21.1 million in Q4 2020 from the same period last year, while for Dec 2020 it was $21.1 million, marking a year-over-year decrease of 2156.13%. This contributed to the annual value of $21.1 million for FY2020, which is 2156.13% down from last year.
- Per JBT Marel's latest filing, its Construction in Progress stood at $21.1 million for Q4 2020, which was down 2156.13% from $26.9 million recorded in Q4 2019.
- In the past 5 years, JBT Marel's Construction in Progress registered a high of $26.9 million during Q4 2019, and its lowest value of $14.8 million during Q4 2016.
- Its 5-year average for Construction in Progress is $21.2 million, with a median of $21.1 million in 2017.
- As far as peak fluctuations go, JBT Marel's Construction in Progress soared by 4256.76% in 2017, and later plummeted by 2156.13% in 2020.
- Over the past 5 years, JBT Marel's Construction in Progress (Quarter) stood at $14.8 million in 2016, then soared by 42.57% to $21.1 million in 2017, then rose by 5.21% to $22.2 million in 2018, then increased by 21.17% to $26.9 million in 2019, then decreased by 21.56% to $21.1 million in 2020.
- Its Construction in Progress stands at $21.1 million for Q4 2020, versus $26.9 million for Q4 2019 and $22.2 million for Q4 2018.