Growth Metrics

Jbt Marel (JBTM) Construction in Progress (2016 - 2020)

Jbt Marel's Construction in Progress history spans 10 years, with the latest figure at $21.1 million for Q4 2020.

  • For Q4 2020, Construction in Progress fell 21.56% year-over-year to $21.1 million; the TTM value through Dec 2020 reached $21.1 million, down 21.56%, while the annual FY2020 figure was $21.1 million, 21.56% down from the prior year.
  • Construction in Progress reached $21.1 million in Q4 2020 per JBTM's latest filing, down from $26.9 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $26.9 million in Q4 2019 to a low of $14.8 million in Q4 2016.
  • Average Construction in Progress over 5 years is $21.2 million, with a median of $21.1 million recorded in 2017.
  • Peak YoY movement for Construction in Progress: soared 42.57% in 2017, then fell 21.56% in 2020.
  • A 5-year view of Construction in Progress shows it stood at $14.8 million in 2016, then skyrocketed by 42.57% to $21.1 million in 2017, then rose by 5.21% to $22.2 million in 2018, then grew by 21.17% to $26.9 million in 2019, then dropped by 21.56% to $21.1 million in 2020.
  • Per Business Quant, the three most recent readings for JBTM's Construction in Progress are $21.1 million (Q4 2020), $26.9 million (Q4 2019), and $22.2 million (Q4 2018).