Itron (ITRI) Construction in Progress (2016 - 2025)
Itron's Construction in Progress history spans 16 years, with the latest figure at $19.2 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 13.58% year-over-year to $19.2 million; the TTM value through Dec 2025 reached $19.2 million, down 13.58%, while the annual FY2025 figure was $19.2 million, 13.58% down from the prior year.
- Construction in Progress reached $19.2 million in Q4 2025 per ITRI's latest filing, down from $21.4 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $40.1 million in Q3 2021 to a low of $18.2 million in Q1 2023.
- Average Construction in Progress over 5 years is $25.1 million, with a median of $21.7 million recorded in 2024.
- Peak YoY movement for Construction in Progress: increased 25.78% in 2021, then tumbled 50.91% in 2022.
- A 5-year view of Construction in Progress shows it stood at $39.5 million in 2021, then crashed by 50.91% to $19.4 million in 2022, then increased by 25.32% to $24.3 million in 2023, then dropped by 8.51% to $22.2 million in 2024, then fell by 13.58% to $19.2 million in 2025.
- Per Business Quant, the three most recent readings for ITRI's Construction in Progress are $19.2 million (Q4 2025), $21.4 million (Q3 2025), and $20.4 million (Q2 2025).