Itron (ITRI) Construction in Progress: 2010-2025
Historic Construction in Progress for Itron (ITRI) over the last 15 years, with Sep 2025 value amounting to $21.4 million.
- Itron's Construction in Progress rose 9.22% to $21.4 million in Q3 2025 from the same period last year, while for Sep 2025 it was $21.4 million, marking a year-over-year increase of 9.22%. This contributed to the annual value of $22.2 million for FY2024, which is 8.51% down from last year.
- Per Itron's latest filing, its Construction in Progress stood at $21.4 million for Q3 2025, which was up 4.91% from $20.4 million recorded in Q2 2025.
- Itron's 5-year Construction in Progress high stood at $40.1 million for Q3 2021, and its period low was $18.2 million during Q1 2023.
- Its 3-year average for Construction in Progress is $21.0 million, with a median of $21.2 million in 2025.
- In the last 5 years, Itron's Construction in Progress climbed by 25.78% in 2021 and then crashed by 50.91% in 2022.
- Over the past 5 years, Itron's Construction in Progress (Quarterly) stood at $39.5 million in 2021, then tumbled by 50.91% to $19.4 million in 2022, then increased by 25.32% to $24.3 million in 2023, then dropped by 8.51% to $22.2 million in 2024, then climbed by 9.22% to $21.4 million in 2025.
- Its Construction in Progress stands at $21.4 million for Q3 2025, versus $20.4 million for Q2 2025 and $21.2 million for Q1 2025.