Itron (ITRI) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Itron (ITRI) over the last 16 years, with Q3 2025 value amounting to $21.4 million.
- Itron's Construction in Progress rose 921.8% to $21.4 million in Q3 2025 from the same period last year, while for Sep 2025 it was $21.4 million, marking a year-over-year increase of 921.8%. This contributed to the annual value of $22.2 million for FY2024, which is 850.88% down from last year.
- According to the latest figures from Q3 2025, Itron's Construction in Progress is $21.4 million, which was up 921.8% from $20.4 million recorded in Q2 2025.
- In the past 5 years, Itron's Construction in Progress registered a high of $40.1 million during Q3 2021, and its lowest value of $18.2 million during Q1 2023.
- For the 5-year period, Itron's Construction in Progress averaged around $25.4 million, with its median value being $22.1 million (2024).
- Per our database at Business Quant, Itron's Construction in Progress surged by 2578.2% in 2021 and then tumbled by 5091.2% in 2022.
- Quarter analysis of 5 years shows Itron's Construction in Progress stood at $39.5 million in 2021, then plummeted by 50.91% to $19.4 million in 2022, then rose by 25.32% to $24.3 million in 2023, then decreased by 8.51% to $22.2 million in 2024, then fell by 3.82% to $21.4 million in 2025.
- Its Construction in Progress stands at $21.4 million for Q3 2025, versus $20.4 million for Q2 2025 and $21.2 million for Q1 2025.