Itron (ITRI) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Itron (ITRI) over the last 16 years, with Q4 2025 value amounting to $19.2 million.
- Itron's Construction in Progress fell 1357.94% to $19.2 million in Q4 2025 from the same period last year, while for Dec 2025 it was $19.2 million, marking a year-over-year decrease of 1357.94%. This contributed to the annual value of $19.2 million for FY2025, which is 1357.94% down from last year.
- According to the latest figures from Q4 2025, Itron's Construction in Progress is $19.2 million, which was down 1357.94% from $21.4 million recorded in Q3 2025.
- Over the past 5 years, Itron's Construction in Progress peaked at $40.1 million during Q3 2021, and registered a low of $18.2 million during Q1 2023.
- For the 5-year period, Itron's Construction in Progress averaged around $25.1 million, with its median value being $21.7 million (2024).
- As far as peak fluctuations go, Itron's Construction in Progress skyrocketed by 2578.2% in 2021, and later plummeted by 5091.2% in 2022.
- Itron's Construction in Progress (Quarter) stood at $39.5 million in 2021, then crashed by 50.91% to $19.4 million in 2022, then increased by 25.32% to $24.3 million in 2023, then dropped by 8.51% to $22.2 million in 2024, then dropped by 13.58% to $19.2 million in 2025.
- Its Construction in Progress was $19.2 million in Q4 2025, compared to $21.4 million in Q3 2025 and $20.4 million in Q2 2025.