Growth Metrics

Itron (ITRI) Construction in Progress (2016 - 2026)

Itron filings provide 17 years of Construction in Progress readings, the most recent being $18.1 million for Q1 2026.

  • On a quarterly basis, Construction in Progress fell 14.74% to $18.1 million in Q1 2026 year-over-year; TTM through Mar 2026 was $18.1 million, a 14.74% decrease, with the full-year FY2025 number at $19.2 million, down 13.58% from a year prior.
  • Construction in Progress hit $18.1 million in Q1 2026 for Itron, down from $19.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $35.8 million in Q1 2022 to a low of $18.1 million in Q1 2026.
  • Median Construction in Progress over the past 5 years was $20.6 million (2023), compared with a mean of $22.0 million.
  • Biggest five-year swings in Construction in Progress: crashed 50.91% in 2022 and later increased 25.32% in 2023.
  • Itron's Construction in Progress stood at $19.4 million in 2022, then increased by 25.32% to $24.3 million in 2023, then dropped by 8.51% to $22.2 million in 2024, then fell by 13.58% to $19.2 million in 2025, then fell by 6.05% to $18.1 million in 2026.
  • The last three reported values for Construction in Progress were $18.1 million (Q1 2026), $19.2 million (Q4 2025), and $21.4 million (Q3 2025) per Business Quant data.