Growth Metrics

Iridex (IRIX) Work In Process (2016 - 2024)

Iridex has reported Work In Process over the past 12 years, most recently at $15000.0 for Q3 2024.

  • For Q3 2024, Work In Process fell 96.53% year-over-year to $15000.0; the TTM value through Sep 2024 reached $15000.0, down 96.53%, while the annual FY2023 figure was $156000.0, 51.25% down from the prior year.
  • Work In Process for Q3 2024 was $15000.0 at Iridex, down from $20000.0 in the prior quarter.
  • Over five years, Work In Process peaked at $747000.0 in Q1 2020 and troughed at $15000.0 in Q3 2024.
  • A 5-year average of $357611.1 and a median of $358500.0 in 2022 define the central range for Work In Process.
  • Biggest five-year swings in Work In Process: surged 59.2% in 2022 and later plummeted 96.53% in 2024.
  • Year by year, Work In Process stood at $601000.0 in 2020, then crashed by 30.95% to $415000.0 in 2021, then dropped by 22.89% to $320000.0 in 2022, then plummeted by 51.25% to $156000.0 in 2023, then tumbled by 90.38% to $15000.0 in 2024.
  • Business Quant data shows Work In Process for IRIX at $15000.0 in Q3 2024, $20000.0 in Q2 2024, and $135000.0 in Q1 2024.