Growth Metrics

iQIYI (IQ) Construction in Progress (2017 - 2024)

Historic Construction in Progress for iQIYI (IQ) over the last 8 years, with Q4 2024 value amounting to $14.1 million.

  • iQIYI's Construction in Progress rose 33000.18% to $14.1 million in Q4 2024 from the same period last year, while for Dec 2024 it was $14.1 million, marking a year-over-year increase of 33000.18%. This contributed to the annual value of $14.1 million for FY2024, which is 32191.81% up from last year.
  • iQIYI's Construction in Progress amounted to $14.1 million in Q4 2024, which was up 33000.18% from $3.3 million recorded in Q4 2023.
  • iQIYI's Construction in Progress' 5-year high stood at $14.1 million during Q4 2024, with a 5-year trough of $1.1 million in Q4 2021.
  • In the last 5 years, iQIYI's Construction in Progress had a median value of $3.3 million in 2023 and averaged $4.7 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first plummeted by 7206.64% in 2021, then skyrocketed by 33000.18% in 2024.
  • Over the past 5 years, iQIYI's Construction in Progress (Quarter) stood at $3.8 million in 2020, then plummeted by 72.07% to $1.1 million in 2021, then increased by 20.51% to $1.3 million in 2022, then surged by 154.53% to $3.3 million in 2023, then surged by 330.0% to $14.1 million in 2024.
  • Its Construction in Progress was $14.1 million in Q4 2024, compared to $3.3 million in Q4 2023 and $1.3 million in Q4 2022.