INNEOVA Holdings (INEO) Construction in Progress (2023)

Historic Construction in Progress for INNEOVA Holdings (INEO) over the last 1 years, with Q4 2023 value amounting to $455000.0.

  • INNEOVA Holdings' Construction in Progress changed N/A to $455000.0 in Q4 2023 from the same period last year, while for Dec 2023 it was $455000.0, marking a year-over-year change of. This contributed to the annual value of $455000.0 for FY2023, which is N/A changed from last year.
  • Latest data reveals that INNEOVA Holdings reported Construction in Progress of $455000.0 as of Q4 2023.
  • Over the past 5 years, INNEOVA Holdings' Construction in Progress peaked at $455000.0 during Q4 2023, and registered a low of $455000.0 during Q4 2023.