Insteel Industries (IIIN) Construction in Progress (2016 - 2025)
Insteel Industries (IIIN) has disclosed Construction in Progress for 15 consecutive years, with $2.5 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress fell 45.44% to $2.5 million in Q4 2025 year-over-year; TTM through Dec 2025 was $2.5 million, a 45.44% decrease, with the full-year FY2025 number at $2.3 million, down 46.32% from a year prior.
- Construction in Progress was $2.5 million for Q4 2025 at Insteel Industries, up from $2.3 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $28.3 million in Q3 2023 to a low of $2.1 million in Q2 2025.
- A 5-year average of $10.3 million and a median of $8.9 million in 2021 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: surged 661.19% in 2021, then crashed 84.13% in 2024.
- Insteel Industries' Construction in Progress stood at $10.2 million in 2021, then surged by 88.87% to $19.2 million in 2022, then plummeted by 32.12% to $13.1 million in 2023, then crashed by 65.17% to $4.6 million in 2024, then tumbled by 45.44% to $2.5 million in 2025.
- Per Business Quant, the three most recent readings for IIIN's Construction in Progress are $2.5 million (Q4 2025), $2.3 million (Q3 2025), and $2.1 million (Q2 2025).