Growth Metrics

Huya (HUYA) Construction in Progress (2021 - 2023)

Huya has reported Construction in Progress over the past 3 years, most recently at $34.6 million for Q4 2023.

  • For Q4 2023, Construction in Progress rose 151.31% year-over-year to $34.6 million; the TTM value through Dec 2023 reached $34.6 million, up 151.31%, while the annual FY2023 figure was $35.2 million, 156.05% up from the prior year.
  • Construction in Progress for Q4 2023 was $34.6 million at Huya, up from $13.7 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $34.6 million in Q4 2023 and troughed at $878552.7 in Q4 2021.
  • A 3-year average of $16.4 million and a median of $13.7 million in 2022 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: surged 1464.97% in 2022 and later soared 151.31% in 2023.
  • Year by year, Construction in Progress stood at $878552.7 in 2021, then surged by 1464.97% to $13.7 million in 2022, then soared by 151.31% to $34.6 million in 2023.
  • Business Quant data shows Construction in Progress for HUYA at $34.6 million in Q4 2023, $13.7 million in Q4 2022, and $878552.7 in Q4 2021.