Growth Metrics

Huya (HUYA) Construction in Progress (2021 - 2023)

Historic Construction in Progress for Huya (HUYA) over the last 3 years, with Q4 2023 value amounting to $34.6 million.

  • Huya's Construction in Progress rose 15131.45% to $34.6 million in Q4 2023 from the same period last year, while for Dec 2023 it was $34.6 million, marking a year-over-year increase of 15131.45%. This contributed to the annual value of $34.6 million for FY2023, which is 15131.45% up from last year.
  • As of Q4 2023, Huya's Construction in Progress stood at $34.6 million, which was up 15131.45% from $13.7 million recorded in Q4 2022.
  • Huya's Construction in Progress' 5-year high stood at $34.6 million during Q4 2023, with a 5-year trough of $878552.7 in Q4 2021.
  • Moreover, its 3-year median value for Construction in Progress was $13.7 million (2022), whereas its average is $16.4 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 146497.29% in 2022, then surged by 15131.45% in 2023.
  • Quarter analysis of 3 years shows Huya's Construction in Progress stood at $878552.7 in 2021, then surged by 1464.97% to $13.7 million in 2022, then skyrocketed by 151.31% to $34.6 million in 2023.
  • Its Construction in Progress stands at $34.6 million for Q4 2023, versus $13.7 million for Q4 2022 and $878552.7 for Q4 2021.