Huya (HUYA) Construction in Progress (2021 - 2023)
Historic Construction in Progress for Huya (HUYA) over the last 3 years, with Q4 2023 value amounting to $34.6 million.
- Huya's Construction in Progress rose 15131.45% to $34.6 million in Q4 2023 from the same period last year, while for Dec 2023 it was $34.6 million, marking a year-over-year increase of 15131.45%. This contributed to the annual value of $34.6 million for FY2023, which is 15131.45% up from last year.
- As of Q4 2023, Huya's Construction in Progress stood at $34.6 million, which was up 15131.45% from $13.7 million recorded in Q4 2022.
- In the past 5 years, Huya's Construction in Progress ranged from a high of $34.6 million in Q4 2023 and a low of $878552.7 during Q4 2021
- Its 3-year average for Construction in Progress is $16.4 million, with a median of $13.7 million in 2022.
- Per our database at Business Quant, Huya's Construction in Progress soared by 146497.29% in 2022 and then skyrocketed by 15131.45% in 2023.
- Huya's Construction in Progress (Quarter) stood at $878552.7 in 2021, then skyrocketed by 1464.97% to $13.7 million in 2022, then soared by 151.31% to $34.6 million in 2023.
- Its Construction in Progress stands at $34.6 million for Q4 2023, versus $13.7 million for Q4 2022 and $878552.7 for Q4 2021.