Himalaya Shipping (HSHP) Construction in Progress (2022 - 2024)

Historic Construction in Progress for Himalaya Shipping (HSHP) over the last 3 years, with Q1 2024 value amounting to $67.1 million.

  • Himalaya Shipping's Construction in Progress changed N/A to $67.1 million in Q1 2024 from the same period last year, while for Mar 2024 it was $67.1 million, marking a year-over-year change of. This contributed to the annual value of $132.6 million for FY2023, which is 2469.5% down from last year.
  • According to the latest figures from Q1 2024, Himalaya Shipping's Construction in Progress is $67.1 million.
  • In the past 5 years, Himalaya Shipping's Construction in Progress ranged from a high of $176.1 million in Q4 2022 and a low of $67.1 million during Q1 2024
  • For the 3-year period, Himalaya Shipping's Construction in Progress averaged around $125.7 million, with its median value being $132.6 million (2023).
  • Within the past 5 years, the most significant YoY rise in Himalaya Shipping's Construction in Progress was 2469.5% (2023), while the steepest drop was 2469.5% (2023).
  • Quarter analysis of 3 years shows Himalaya Shipping's Construction in Progress stood at $176.1 million in 2022, then decreased by 24.69% to $132.6 million in 2023, then plummeted by 49.4% to $67.1 million in 2024.
  • Its last three reported values are $67.1 million in Q1 2024, $132.6 million for Q4 2023, and $108.8 million during Q3 2023.